View Requests - 4,469 found

Pothole at 534–598 Warren St

COMPLETED Work on this request has been completed. Thank you for your request. - 4 days ago #SR-100585
Pothole at 534–598 Warren St

Pothole at 124 Heath St, Chestnut Hill

COMPLETED Work on this request has been completed. Thank you for your request. - 4 days ago #SR-100582
Pothole at 124 Heath St, Chestnut Hill

Pothole at 2–16 Claflin Path, Brookline 02445

Several large potholes
NO WORK REQUIRED This request has been marked resolved by the Town of Brookline. -The Highway Department is dedicated to providing high-quality asphalt repairs for our roads and sidewalks. Regrettably, it's important to note that maintenance work conducted by the Highway Department does not extend to private ways or paths. - 4 days ago #SR-101599
Pothole at 2–16 Claflin Path, Brookline 02445

Pothole at 25 Davis Ave

Riding east towards Brookline village on Davis Ave is hazardous. The section from Cypress to Washington is a medley of patches, potholes, and crumbling surfaces. This section needs to be repaved.
COMPLETED Work on this request has been completed. Thank you for your request. - 4 days ago #SR-98412

Pothole at 118 Davis Ave

Potholes at 118, 74, and 40 Davis Ave on the eastbound side. These make bike riders veer into the driving lane.
COMPLETED Work on this request has been completed. Thank you for your request. - 4 days ago #SR-98665

Pothole at 40 Centre St

Still no action on the bad patch done by cowboy contractors Manet. And no timeline for Centre St resurfacing(def not this year). Developers win, renters like me lose.
NO WORK REQUIRED This request has been marked resolved by the Town of Brookline. A meeting was held this morning with the Highway Department, the Engineering Department, and the project manager. The contractor will repair the patch as soon as possible and schedule the improvements to the ADA ramps. - 5 days ago #SR-101569
Pothole at 40 Centre St

Pothole at 45 Coolidge St

Large pothole multiple levels deep.
COMPLETED Work on this request has been completed. Thank you for your request. - 5 days ago #SR-100367
Pothole at 45 Coolidge St

Pothole at Carlton St & Commonwealth Ave

Very large pothole on right side of the left-most lane of Carlton St heading northbound, 3 car lengths before (south of) intersection with Commonwealth Ave. ~location 42°20'59.9"N 71°06'33.8"W
COMPLETED Work on this request has been completed. Thank you for your request. - 5 days ago #SR-100252

Pothole at 20 Chapel St

Pothole in front of fire hydrant valve in street
COMPLETED Work on this request has been completed. Thank you for your request. - 5 days ago #SR-99136
Pothole at 20 Chapel St

Pothole at 40 Centre St

Tell the crap contractor you hired to fix the road please.
NO WORK REQUIRED This request has been marked resolved by the Town of Brookline. The Highway Department, in collaboration with the Engineering Department, has contacted the contractor working at this location to address this issue. However, it is important to note that the road will be milled and paved as part of the 40 Centre St project. Additionally, a meeting will be held between the Engineering Department and the contractor to improve safety in work zones. - 8 days ago #SR-101377
Web_branding_watermark

Help make Brookline more beautiful

BrookONline enables real-time collaboration with citizens, 'deputizing' mobile users to become the city's eyes and ears. Citizens report potholes, graffiti, and other issues from anywhere in the Town using their mobile phone. For each issue, type in or select a location, take a photo, pick a specific issue from a drop down, type in a brief description, and enter your email address to receive timely updates.

Start Reporting

  • Android_market
  • App_store

Status

Services