Sidewalk Repair at 317 South St, Chestnut Hill
We have side walk then no side walk. Can we fill this in with cement or tar?
ON HOLD
The Work Order for this Service Request has been put on hold: Thank you for your request. This is currently being discussed with the Forestry Division to determine whether the tree that was located in that spot will be replaced
Thank you for your request. This is currently being discussed with the Forestry Division to determine whether the tree that was located in that spot will be replaced. -
5 months ago
#SR-111613
|
|
Sidewalk Repair at 118 Sumner Rd
Low quality concrete was used on the sidewalk replacement on both sides, is now crumbling and looks very ugly. The contractor needs to replace for free.
ON HOLD
The Work Order for this Service Request has been put on hold: This work was completed by a contractor under the supervision of the Engineering and Transportation Division. The matter has already been referred to Engineering, and an investigation is currently underway. For any further questions, please feel free to contact them at 617-730-2139.
This work was completed by a contractor under the supervision of the Engineering and Transportation Division. The matter has already been referred to Engineering, and an investigation is currently underway. For any further questions, please feel free to contact them at 617-730-2139. -
5 months ago
#SR-112052
|
|
|
Sidewalk Repair at 17 Blake Rd
Low quality concrete was used on the sidewalk replacement on odd number side, is now crumbling and looks very ugly. The contractor needs to replace for free.
ON HOLD
The Work Order for this Service Request has been put on hold: This work was completed by a contractor under the supervision of the Engineering and Transportation Division. The matter has already been referred to Engineering, and an investigation is currently underway. For any further questions, please feel free to contact them at 617-730-2139.
This work was completed by a contractor under the supervision of the Engineering and Transportation Division. The matter has already been referred to Engineering, and an investigation is currently underway. For any further questions, please feel free to contact them at 617-730-2139. -
5 months ago
#SR-112051
|
|
|
Sidewalk Repair at 38–64 Tappan St
Low quality concrete was used on the sidewalk replacement on both sides, is now crumbling and looks very ugly. The contractor needs to replace for free.
ON HOLD
The Work Order for this Service Request has been put on hold: This work was completed by a contractor under the supervision of the Engineering and Transportation Division. The matter has already been referred to Engineering, and an investigation is currently underway. For any further questions, please feel free to contact them at 617-730-2139.
This work was completed by a contractor under the supervision of the Engineering and Transportation Division. The matter has already been referred to Engineering, and an investigation is currently underway. For any further questions, please feel free to contact them at 617-730-2139. -
5 months ago
#SR-112050
|
|
|
Sidewalk Repair at 8 Pearl St
Damage sidewalk never replaced, please excavate and pour new concrete as asphalt looks very bad
ASSIGNED
A work order has been assigned for this request. A team from the HIGHWAY division will be responding.
-
5 months ago
#SR-111849
|
|
Sidewalk Repair at 870 Hammond St, Chestnut Hill
Damage from bus
ASSIGNED
A work order has been assigned for this request. A team from the HIGHWAY division will be responding.
-
6 months ago
#SR-111813
|
|
Sidewalk Repair at 6 Pearl St
Please patch around tactile strip with concrete patch, its a hazard for wheelchairs
ASSIGNED
A work order has been assigned for this request. A team from the HIGHWAY division will be responding.
-
6 months ago
#SR-111783
|
|
Sidewalk Repair at 42.332N 71.142W
Dangerous rise inside walk. I have fallen three times already here. At this point, I'm ready to take legal action against you.
ASSIGNED
A work order has been assigned for this request. A team from the HIGHWAY division will be responding.
-
6 months ago
#SR-111735
|
|
Sidewalk Repair at 302 Ellery Ct, Chestnut Hill
Sidewalk fallen a part
ASSIGNED
A work order has been assigned for this request. A team from the HIGHWAY division will be responding.
-
6 months ago
#SR-111611
|
|
Sidewalk Repair at 265 Russett Rd, Chestnut Hill
Pretty bad sidewalk disruption probably due to frost heaves. On the East side of the street.
ASSIGNED
A work order has been assigned for this request. A team from the HIGHWAY division will be responding.
-
6 months ago
#SR-111519
|
|