View Requests - 5,156 found
Sidewalk Repair at 100 Chestnut St
FWD TO ENGINEERING DIVISION
This request has been marked resolved by the Town of Brookline.
- Once the contractor has finished work on the property, the property owner is responsible for any necessary sidewalk repairs. Our Engineering Division carefully oversees these activities to ensure everything is done correctly and safely. If you have any questions or need assistance, please feel free to reach out to the Engineering and Transportation Division at 617-730-213 -
3 months ago
#SR-125073
|
|
Sidewalk Repair at 110 Chestnut St
ASSIGNED
A work order has been assigned for this request. A team from the HIGHWAY division will be responding.
-
3 months ago
#SR-125072
|
|
Sidewalk Repair at 96 Chestnut St
ASSIGNED
A work order has been assigned for this request. A team from the HIGHWAY division will be responding.
-
3 months ago
#SR-125068
|
|
Sidewalk Repair at 90 Chestnut St
FWD TO ENGINEERING DIVISION
This request has been marked resolved by the Town of Brookline.
Once the contractor has finished work on the property, the property owner is responsible for any necessary sidewalk repairs. Our Engineering Division carefully oversees these activities to ensure everything is done correctly and safely. If you have any questions or need assistance, please feel free to reach out to the Engineering and Transportation Division at 617-730-213 -
3 months ago
#SR-125067
|
|
Sidewalk Repair at 230–258 High St
ASSIGNED
A work order has been assigned for this request. A team from the HIGHWAY division will be responding.
-
3 months ago
#SR-125071
|
|
Sidewalk Repair at 471 Washington St
damage
DUPLICATE REQUEST
This request has been marked resolved by the Town of Brookline.
The Highway Division is committed to repairing the sidewalks to enhance the enjoyment and safety of our community. We have already assigned Work Order #WO-210850 for this location. -
3 months ago
#SR-125078
|
|
Sidewalk Repair at 95 Perry St
Sidewalk missing. Yes there's construction but I'm worried this is going to take quite a while and in the meantime you have a sidewalk that gets a LOT of kids walking to school each much less safely
FWD TO ENGINEERING DIVISION
This request has been marked resolved by the Town of Brookline.
-
3 months ago
#SR-125064
|
|
Sidewalk Repair at 16 Blake Rd
The sidewalk in front of 12 and 16 Blake Rd. appears patchy and uneven. It is raised and several small kids on their scooters have tripped and fallen.
DUPLICATE REQUEST
This request has been marked resolved by the Town of Brookline.
-The Highway Division is committed to repairing the sidewalks to enhance the enjoyment and safety of our community. We have already assigned Work Order #WO-227533 for this location. -
3 months ago
#SR-125039
|
|
Sidewalk Repair at 26 John St
Sidewalk at 26 and 24 John Street getting worse. Treacherous in the winter.
DUPLICATE REQUEST
This request has been marked resolved by the Town of Brookline.
- The Highway Division is committed to repairing the sidewalks to enhance the enjoyment and safety of our community. We have already assigned Work Order #WO-204114 for this location, and it is included in our priority list. -
3 months ago
#SR-125260
|
|
|
Sidewalk Repair at 20 Sumner Rd
The sidewalk here is becoming very uneven.
COMPLETED
Work on this request has been completed. Thank you for your request.
-
3 months ago
#SR-101413
|
|
Help make Brookline more beautiful
BrookONline enables real-time collaboration with citizens, 'deputizing' mobile users to become the city's eyes and ears. Citizens report potholes, graffiti, and other issues from anywhere in the Town using their mobile phone.
For each issue, type in or select a location, take a photo, pick a specific issue from a drop down, type in a brief description, and enter your email address to receive timely updates.
Start Reporting