View Requests - 5,171 found
Sidewalk Repair at 4 Cypress St
NO WORK REQUIRED
This request has been marked resolved by the Town of Brookline.
-
5 months ago
#SR-107160
|
|
|
Sidewalk Repair at 29 Green St
WORK ALREADY COMPLETED
Work on this request has already been completed.
-
5 months ago
#SR-124990
|
|
|
Sidewalk Repair at 24 Blake Rd
ASSIGNED
A work order has been assigned for this request. A team from the HIGHWAY division will be responding.
-
5 months ago
#SR-124871
|
|
|
Sidewalk Repair at 16 Blake Rd
ASSIGNED
A work order has been assigned for this request. A team from the HIGHWAY division will be responding.
-
5 months ago
#SR-124867
|
|
|
Sidewalk Repair at 4 Sumner Rd
ISSUE REVIEWED
This request has been marked resolved by the Town of Brookline.
The Highway Division is currently performing sidewalk replacement with concrete and has not yet completed the work. Once the project is finished, we will ensure that a street sweeper is sent to this area. -
5 months ago
#SR-124975
|
|
|
Sidewalk Repair at 2 Pearl St
FWD TO ENGINEERING DIVISION
This request has been marked resolved by the Town of Brookline.
This is currently under investigation by the Engineering and Transportation Division. For any further questions, feel free to contact them at 617-730-2139. -
5 months ago
#SR-124851
|
|
|
Sidewalk Repair at 147 Newton St
ASSIGNED
A work order has been assigned for this request. A team from the HIGHWAY division will be responding.
-
5 months ago
#SR-124745
|
|
|
Sidewalk Repair at 6 Smythe St
ASSIGNED
A work order has been assigned for this request. A team from the HIGHWAY division will be responding.
-
5 months ago
#SR-124688
|
|
|
Sidewalk Repair at 17 Lowell Rd
ASSIGNED
A work order has been assigned for this request. A team from the HIGHWAY division will be responding.
-
5 months ago
#SR-124639
|
|
|
Sidewalk Repair at 64 Sumner Rd
DUPLICATE REQUEST
This request has been marked resolved by the Town of Brookline.
After a careful inspection of the area, we have determined that there is no safety hazard in some parts of your request. While there are cracks in the concrete, they do not pose a risk to pedestrians. In addition, a request for repairs in some areas of this sidewalk has already been assigned as a work order, so this would be considered a duplicate request. Please note that repairs completed by the Highway Division are focused on addressing conditions that may create potential hazards, in order to ensure the safety and well-being of our community. -
5 months ago
#SR-124748
|
|
|
Help make Brookline more beautiful
BrookONline enables real-time collaboration with citizens, 'deputizing' mobile users to become the city's eyes and ears. Citizens report potholes, graffiti, and other issues from anywhere in the Town using their mobile phone.
For each issue, type in or select a location, take a photo, pick a specific issue from a drop down, type in a brief description, and enter your email address to receive timely updates.
Start Reporting