View Requests - 5,086 found
Sidewalk Repair at 16 Gorham Ave
Hideous asphalt excavation on sidewalk. Looks very bad and against town policy. Please tell conctractor to pour concrete
ASSIGNED
A work order has been assigned for this request. A team from the HIGHWAY division will be responding.
-
4 months ago
#SR-118682
|
|
Sidewalk Repair at Warren St
Warren and Dudley. Third request.
NO WORK REQUIRED
This request has been marked resolved by the Town of Brookline.
The Highway Division is committed to repairing sidewalks for the benefit of our community and has already assigned Work Order #WO-223211 to this location. This project is also included in our priority list. -
4 months ago
#SR-119019
|
|
Sidewalk Repair at 1223 Beacon St
Concrete walk failing creating a trip hazard
NO WORK REQUIRED
This request has been marked resolved by the Town of Brookline.
- The Highway Division is committed to repairing sidewalks for the benefit of our community and has already assigned Work Order #WO-156119 to this location. -
4 months ago
#SR-118600
|
|
Sidewalk Repair at 98 Chestnut St
Both of the sidewalk patches for utilities were not repaired properly and are now sinking again.
COMPLETED
Work on this request has been completed. Thank you for your request.
-
4 months ago
#SR-111829
|
|
Sidewalk Repair at 1661 Beacon St
bike lockup pulled out in front of Mamaleh’s
WORK ALREADY COMPLETED
Work on this request has already been completed.
-
4 months ago
#SR-112466
|
|
Sidewalk Repair at 200 Crafts Rd, Chestnut Hill
Poor quality concrete used on sidewalk, now spalling. Please tell contractor to replace at their expense
ON HOLD
The Work Order for this Service Request has been put on hold: - This work was completed by a contractor under the supervision of the Engineering and Transportation Division. Currently this is under investigation. For any further questions, feel free to contact them at 617-730-2139.
-
4 months ago
#SR-116873
|
|
|
Sidewalk Repair at 200 Crafts Rd, Chestnut Hill 02467
The sidewalk is breaking down at the corner or Crafts and Cleveland Rd. It is not safe, especially in poor weather
ON HOLD
The Work Order for this Service Request has been put on hold: - This work was completed by a contractor under the supervision of the Engineering and Transportation Division. Currently this is under investigation. For any further questions, feel free to contact them at 617-730-2139.
-
4 months ago
#SR-112462
|
|
Sidewalk Repair at 61 Spooner Rd, Chestnut Hill
Two eight inch dips in the sidewalk. Perfect for rolling your ankle. liability please fix.
ASSIGNED
A work order has been assigned for this request. A team from the HIGHWAY division will be responding.
-
4 months ago
#SR-112380
|
|
Sidewalk Repair at 3 Spooner Rd, Chestnut Hill
Half of sidewalk collapsed.
ASSIGNED
A work order has been assigned for this request. A team from the HIGHWAY division will be responding.
-
4 months ago
#SR-112382
|
|
Sidewalk Repair at 173 Longwood Ave
Chunks missing from sidewalk making it difficult for wheelchairs
ASSIGNED
A work order has been assigned for this request. A team from the HIGHWAY division will be responding.
-
4 months ago
#SR-112320
|
|
Help make Brookline more beautiful
BrookONline enables real-time collaboration with citizens, 'deputizing' mobile users to become the city's eyes and ears. Citizens report potholes, graffiti, and other issues from anywhere in the Town using their mobile phone.
For each issue, type in or select a location, take a photo, pick a specific issue from a drop down, type in a brief description, and enter your email address to receive timely updates.
Start Reporting