Sidewalk Repair at 1–129 Freeman St
Low quality concrete was used on the sidewalk replacement on both sides, is now crumbling and looks very ugly. The contractor needs to replace for free.
ON HOLD
The Work Order for this Service Request has been put on hold: This work was completed by a contractor under the supervision of the Engineering and Transportation Division. The matter has already been referred to Engineering, and an investigation is currently underway. For any further questions, please feel free to contact them at 617-730-2139.
This work was completed by a contractor under the supervision of the Engineering and Transportation Division. The matter has already been referred to Engineering, and an investigation is currently underway. For any further questions, please feel free to contact them at 617-730-2139. -
about 1 month ago
#SR-112054
|
|
|
Sidewalk Repair at 98 Chestnut St
The patches on the sidewalk are sinking below the concrete and need to be redone
NO WORK REQUIRED
This request has been marked resolved by the Town of Brookline.
- This address has been referred to the Engineering Department contractors repair list. For any question feel free to contact them, 617-730-2139. -
about 1 month ago
#SR-112035
|
|
Sidewalk Repair at 317 South St, Chestnut Hill
We have side walk then no side walk. Can we fill this in with cement or tar?
ON HOLD
The Work Order for this Service Request has been put on hold: Thank you for your request. This is currently being discussed with the Forestry Division to determine whether the tree that was located in that spot will be replaced
Thank you for your request. This is currently being discussed with the Forestry Division to determine whether the tree that was located in that spot will be replaced. -
about 1 month ago
#SR-111613
|
|
Sidewalk Repair at 98 Tappan St
Please replace entire sidewalk from greenough to Blake its very bad condition
NO WORK REQUIRED
This request has been marked resolved by the Town of Brookline.
- Our Highway Division is committed to repairing sidewalks for the benefit of our community and has already assigned Work Order #WO-209885 to this location. This project is also included in our priority list. -
about 1 month ago
#SR-112059
|
|
|
Sidewalk Repair at 118 Sumner Rd
Low quality concrete was used on the sidewalk replacement on both sides, is now crumbling and looks very ugly. The contractor needs to replace for free.
ON HOLD
The Work Order for this Service Request has been put on hold: This work was completed by a contractor under the supervision of the Engineering and Transportation Division. The matter has already been referred to Engineering, and an investigation is currently underway. For any further questions, please feel free to contact them at 617-730-2139.
This work was completed by a contractor under the supervision of the Engineering and Transportation Division. The matter has already been referred to Engineering, and an investigation is currently underway. For any further questions, please feel free to contact them at 617-730-2139. -
about 1 month ago
#SR-112052
|
|
|
Sidewalk Repair at 17 Blake Rd
Low quality concrete was used on the sidewalk replacement on odd number side, is now crumbling and looks very ugly. The contractor needs to replace for free.
ON HOLD
The Work Order for this Service Request has been put on hold: This work was completed by a contractor under the supervision of the Engineering and Transportation Division. The matter has already been referred to Engineering, and an investigation is currently underway. For any further questions, please feel free to contact them at 617-730-2139.
This work was completed by a contractor under the supervision of the Engineering and Transportation Division. The matter has already been referred to Engineering, and an investigation is currently underway. For any further questions, please feel free to contact them at 617-730-2139. -
about 1 month ago
#SR-112051
|
|
|
Sidewalk Repair at 38–64 Tappan St
Low quality concrete was used on the sidewalk replacement on both sides, is now crumbling and looks very ugly. The contractor needs to replace for free.
ON HOLD
The Work Order for this Service Request has been put on hold: This work was completed by a contractor under the supervision of the Engineering and Transportation Division. The matter has already been referred to Engineering, and an investigation is currently underway. For any further questions, please feel free to contact them at 617-730-2139.
This work was completed by a contractor under the supervision of the Engineering and Transportation Division. The matter has already been referred to Engineering, and an investigation is currently underway. For any further questions, please feel free to contact them at 617-730-2139. -
about 1 month ago
#SR-112050
|
|
|
Sidewalk Repair at 26 Parkway Rd
Sidewalk cracked and creating serious water pooling issues
NO WORK REQUIRED
This request has been marked resolved by the Town of Brookline.
Issue is on Private property met with resident -
about 1 month ago
#SR-111953
|
|
Sidewalk Repair at 6 Irving St
Power pole has been increasingly leaning it seems.
ON HOLD
The Work Order for this Service Request has been put on hold: - The Highway Division, in collaboration with the Engineering Division, has contacted the contractor (Verizon) responsible for this location to resolve the issue.
- The Highway Division, in collaboration with the Engineering Division, has contacted the contractor (Verizon) responsible for this location to resolve the issue. -
about 1 month ago
#SR-111946
|
|
Sidewalk Repair at 8 Pearl St
Damage sidewalk never replaced, please excavate and pour new concrete as asphalt looks very bad
ASSIGNED
A work order has been assigned for this request. A team from the HIGHWAY division will be responding.
-
2 months ago
#SR-111849
|
|